Tag Archives: Cavigelli

No Roads, No Problem

A unique drone (the WingtraOne) helps a team meet the environmental challenges of planning a wind farm in the Alps. At a lofty altitude of 2500m above sea level, 20 wind turbines 100m tall need to be built. These wind turbines will produce 60 GWh per year to power 15,000 households. The engineering challenge is...